Home   »   BIMSTEC – 3,000 kilometer long Power...

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_4.1

 

WHAT IS BIMSTEC?

  • The Bay of Bengal Initiative for Multi-Sectoral Technical and Economic Cooperation  (BIMSTEC) is a regional multilateral
  • Its members lie in the littoral and adjacent areas of the Bay of Bengal constituting a  contiguous regional unity.

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_5.1

GENESIS OF BIMSTEC

  • On 6 June 1997, a new sub-regional grouping was formed in Bangkok under the name BIST-EC  (Bangladesh, India, Sri Lanka, and Thailand Economic  Cooperation).
  • Following the inclusion of Myanmar on 22 December 1997 during a special Ministerial Meeting in Bangkok,  the Group was renamed ‘BIMST-EC

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_6.1

OBJECTIVE

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_7.1

BIMSTEC ENERGY COOPERATION

  • Since 2017 there were talks on a BIMSTEC  power grid

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_8.1

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_9.1

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_10.1

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_11.1

INDIA AND BANGLADESH ALREADY  HAVE A POWER GRID

  • The governments of India and Bangladesh have completed construction on the Baharampur-  Bheramara cross-border power transmission link  between the countries.
  • Energy Adviser to the Prime Minister said that Bangladesh          is in discussions with Nepal and  Bhutan for trilateral power trade.

WHY CONNECTING BIMSTEC WITH  POWER GRID IS IMPORTANT?

  • It increases importance of BIMSTEC initiative to a large extent
  • It is also important to create a BIMSTEC energy market to keep China’s influence out  of the region in terms of energy sector

CHINA NEPAL POWER GRID UNDERWAY

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_12.1

 

;

 

Latest Burning Issues | Free PDF

 

BIMSTEC – 3,000 kilometer long Power Grid – Free PDF Download_4.1

Sharing is caring!

[related_posts_view]