Deprecated: Return type of Mediavine\Grow\Share_Count_Url_Counts::offsetExists($offset) should either be compatible with ArrayAccess::offsetExists(mixed $offset): bool, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /var/www/html/wp-content/plugins/social-pug/inc/class-share-count-url-counts.php on line 102

Deprecated: Return type of Mediavine\Grow\Share_Count_Url_Counts::offsetGet($offset) should either be compatible with ArrayAccess::offsetGet(mixed $offset): mixed, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /var/www/html/wp-content/plugins/social-pug/inc/class-share-count-url-counts.php on line 112

Deprecated: Return type of Mediavine\Grow\Share_Count_Url_Counts::offsetSet($offset, $value) should either be compatible with ArrayAccess::offsetSet(mixed $offset, mixed $value): void, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /var/www/html/wp-content/plugins/social-pug/inc/class-share-count-url-counts.php on line 122

Deprecated: Return type of Mediavine\Grow\Share_Count_Url_Counts::offsetUnset($offset) should either be compatible with ArrayAccess::offsetUnset(mixed $offset): void, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /var/www/html/wp-content/plugins/social-pug/inc/class-share-count-url-counts.php on line 131

Deprecated: Return type of Mediavine\Grow\Share_Count_Url_Counts::getIterator() should either be compatible with IteratorAggregate::getIterator(): Traversable, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /var/www/html/wp-content/plugins/social-pug/inc/class-share-count-url-counts.php on line 183

Deprecated: Mediavine\Grow\Share_Count_Url_Counts implements the Serializable interface, which is deprecated. Implement __serialize() and __unserialize() instead (or in addition, if support for old PHP versions is necessary) in /var/www/html/wp-content/plugins/social-pug/inc/class-share-count-url-counts.php on line 16

Warning: Undefined array key "_aioseop_description" in /var/www/html/wp-content/themes/job-child/functions.php on line 554

Warning: Trying to access array offset on value of type null in /var/www/html/wp-content/themes/job-child/functions.php on line 554

Deprecated: parse_url(): Passing null to parameter #1 ($url) of type string is deprecated in /var/www/html/wp-content/themes/job-child/functions.php on line 925
Home   »   Bundelkhand Solar Energy Revolution – Free...

Bundelkhand Solar Energy Revolution – Free PDF Download

 

  • The dry Bundelkhand region of central India has remained backward for decades, and its agriculture has been hit owing to scanty rainfall.
  • Now, the solar power sector is booming in Bundelkhand.

  • Bundelkhand’s population density – just 329 per sq. km compared to UP’s 829—means a lot more open spaces.
  • The 70,000 sq. km region comprises seven districts – Bundelkhand, Banda, Hamirpur, Mahoba, Jalaun, Jhansi and Lalitpur – makes up 28.7% of the total area of Uttar Pradesh.
  • Bundelkhand now accounts for 500 MW daily of the solar energy produced by UP.
  • It is part of an ambitious plan by the Yogi government to develop the region into a solar power hub.
  • The solar energy policy in 2017 was created to promote private participation in the field of solar energy.
  • Under this, solar parks were established and solar power was given open access to third-party sales.

Benefits of the incentive provisions:

  • Provision of online single window clearance,
  • A 100 per cent stamp duty exemption for solar power projects,
  • 100 per cent exemption in electricity duty for 10 years.
  • Eleven private solar power companies have so far set up power stations in the region.

  • By 2016, about 200 MW power was being supplied from private solar power plants installed at Panwadi (Mahoba) and Hamirpur.
  • A 20 MW solar power plant at Chahitara village in Banda district has also been in operation since 2016.
  • Today, more than 500 MW is generated daily by the solar plants. 
  • Adani Solar Energy Ltd has commissioned a 25 MW solar power plant in Chhibon village, in Chitrakoot.
  • Another 50 MW solar power plant has also been installed in Chhibon village, which became operational on 30th January, 2021.

  • The project will be set up by Bundelkhand Saur Urja (BSUL).

It is a joint venture company between:

  • Uttar Pradesh Non-Conventional Energy Development Agency (UPNEDA) and
  • National Hydro Power Corporation (NHPC).
  • The project will be set up under the Ultra Mega Renewable Energy Power Park (UMREPP) scheme of the ministry of new and renewable energy (MNRE).
  • The MNRE will provide ₹20 lakh per MW or 30% of the project value, whichever is less, for development of internal infrastructure and connectivity from the park to the nearest transmission system.
  • Land will be taken on lease basis from the farmers for 27 years.
  • They will be a paid a rent of approximately ₹15,000 to 20,000 per acre per year.
  • BSUL will put the entire infrastructure in place before it invites bids from private players to set up plants in the park :
  • construction of roads and
  • setting up evacuation lines.
  • UPNEDA also has a joint venture with Tehri Hydro Development Corporation of India (THDCIL), named TUSCO.
  • TUSCO will develop two 600 MW solar parks, one each in Jhansi and Lalitpur districts.
  • UPNEDA has a 26% share in that JV too.
  • With competition among solar energy companies, electricity rates have also come down.
  • Earlier the solar power companies were selling electricity at the rate of ₹ 7 per kilowatt (unit).
  • Now it is down to ₹ 3 per unit.
  • The Yogi government is planning a green energy corridor to generate 4,000 MW of solar power in Bundelkhand.
  • This will need an investment of about ₹5,500 crore on the development of transmission system for the extraction of energy produced in this corridor.
  • The target will be achieved by installing 1,000 MW worth projects every year from 2021 to 2025.

Other development projects in Bundelkhand

  • Under the project, irrigation will be carried out in the region using advanced agriculture techniques and integrated drip irrigation.
  • Water from the Pahuj Dam in Jhansi will be used for the drip irrigation facility which will be extended to all of Jhansi and some areas around it.
  • The state government is giving a major push to drip or micro irrigation, especially in areas like Bundelkhand where water availability is limited.

  • Israel treats about 92% of its water.
  • Of this, 75% is used for agricultural irrigation.
  • By the end of 2025, the country intends to recycle 95% of its waste water for irrigation use.

 
 

 

Latest Burning Issues | Free PDF

 

Sharing is caring!

Download your free content now!

Congratulations!

We have received your details!

We'll share General Studies Study Material on your E-mail Id.

Download your free content now!

We have already received your details!

We'll share General Studies Study Material on your E-mail Id.

Incorrect details? Fill the form again here

General Studies PDF

Thank You, Your details have been submitted we will get back to you.
[related_posts_view]

Leave a comment

Your email address will not be published. Required fields are marked *